The refrigerants, which has the lowest global warming potential (GWP) is R-717. So, option A is correct.
GWP stands for Global Warming Potential. It is a measure of how much a given amount of a greenhouse gas, such as carbon dioxide or methane, will contribute to global warming over a specified time period, usually 100 years. The GWP of a greenhouse gas is calculated by comparing the amount of heat trapped by the gas to the amount of heat trapped by an equivalent mass of carbon dioxide over the same time period.
There are numerous other low-GWP refrigerants out there, that means you as an HVAC expert need to don't have any trouble locating one proper for the packages you address.
Global warming potential (GWP) can vary substantially in not handiest greenhouse gases, however refrigerants. a few refrigerants will have a global warming potential as excessive as eight,000, because of this one ton of the refrigerant gas traps as tons heat over a given time period as 8,000 heaps of carbon dioxide.
To understand extra about GWP click on here
brainly.com/question/6595067
#SPJ4
The complete question is:
Which of the following refrigerants, which has the lowest global warming potential (GWP)?
A) R-717
B) R-719
C) R-625
D) R-392
3. Which product should be sprayed over an original OEM
finish before clearcoating?
A. Primer
B. Sealer
C. Adhesion promoter
D. Epoxy
Sealer should be sprayed over an original OEM finish before clearcoating. (Option B)
What is the explanation for the above response?A sealer is a type of primer that is specifically designed to provide a smooth and uniform surface for the clearcoat to adhere to. It also helps to prevent any bleeding or discoloration from the original finish, and can improve the overall appearance of the final finish.
While primers and adhesion promoters can also be used in automotive painting, a sealer is the most appropriate product to use over an original OEM finish before clearcoating. Epoxy, on the other hand, is typically used as a primer for bare metal surfaces, rather than over an existing finish.
Learn more about OEM at:
https://brainly.com/question/17422536
#SPJ1
Truss ABC is changed by decreasing its height from H to 0.9 H. Width W and load P are kept the same. Which one of the following statements is true for the revised truss as compared to the original truss?
A. Force in all its members have decreased.
B. Force in all its members have increased.
C. Force in all its members have remained the same.
D. None of the above.
Force in all its members have increased
Force EquationThe vector product of mass (m) and acceleration (a) expresses the quantity of force (a). The force equation or formula can be expressed mathematically as follows:
F = ma In which case,
m = mass a = velocity
It is expressed in Newtons (N) or kilogrammes per second.
The acceleration an is provided by
a = v/t
Where
v = acceleration
t = time spent
As a result, Force can be expressed as follows:
F = mv/t
The formula for inertia is p = mv, which can also be expressed as Momentum.
As a result, force can be defined as the rate of change of momentum.
dp/dt = F = p/t
Force formulas are useful for determining the force, mass, acceleration, momentum, and velocity in any given problem.
To know more about Force,click on the link :
https://brainly.com/question/13191643
#SPJ1
A stone with a mass of 0.600 kg is attached to one end of a string 0.800 m long. The string will break if its tension exceeds 55.0 N. The stone is whirled in a horizontal circle on a frictionless tabletop; the other end of the string remains fixed. Find the maximum speed the stone can attain without breaking the string.
the low-level wind shear alert system (llwas) provides wind data and software process to detect the presence of a
The Low-Level Wind Shear Alert System (LLWAS) provides wind data and software processes to detect the presence of hazardous wind shear.
LLWAS (Low-level windshear alerting systems) is a tool with a system to detect the presence of windshears close to the airport, and will provide warning windshear information automatically if has exceeded its threshold.
It works by collecting data from wind speed and direction sensors located around an airport to provide real-time monitoring of changes in wind direction and speed that can lead to hazardous wind shear events. The data is used to create an alert if hazardous wind shear is detected.
Learn more about LLWAS : https://brainly.com/question/30001468
#SPJ11
why must you consider output impedance of signal conditioning circuit or input impedance of measuring device
It is important to consider the output impedance of a signal conditioning circuit and the input impedance of the measuring device for several reasons. First, the signal conditioner’s output impedance will affect the amplitude and frequency response of the signal as it is sent to the measurement device.
1) If the impedance of the signal conditioner and the measuring device don't match, it can lead to incorrect readings.
2) Secondly, the signal conditioner’s output impedance also affects the signal-to-noise ratio, which can influence the quality of the measurements taken.
3) Lastly, the input impedance of the measuring device must match the output impedance of the signal conditioning circuit in order to ensure a low-distortion signal that accurately reflects the original signal.
In summary, it is important to consider the output impedance of the signal conditioning circuit and the input impedance of the measuring device in order to ensure accurate and high-quality measurements.
It is important to consider the output impedance of a signal conditioning circuit or the input impedance of a measuring device for optimal performance and accurate measurements. This is because the impedance values affect the signal transfer between the circuit and the device.
The input impedance of a measuring device refers to the resistance of the device input to the output impedance of the signal conditioning circuit.
If the input impedance of the device is too low, it can lead to a large current flowing from the circuit to the device, which can cause distortion and reduce the accuracy of the measurement.
On the other hand, if the input impedance is too high, it can affect the signal transfer between the circuit and the device, leading to a loss of signal strength and distortion.
For more such questions on impedance
https://brainly.com/question/29853108
#SPJ11
Do you think test-driven development is a good idea? What might be a benefit of this approach? What might be a drawback?
Answer:
Test-driven development is a great idea for software development projects, as it helps ensure that the code is properly tested and written correctly. The benefit of this approach is that it allows for more accurate debugging and testing, resulting in fewer errors in the final product. The drawback is that it can be time consuming and expensive to implement, and may require additional resources to ensure that all tests are done properly.
_______ is the movement of electrons from one atom to another.
A/an _______ is a unit of the amount of current flow.
A/an _______ is a unit of electrical pressure.
A/an _______ involves a copper-to-copper connection whereas a short-to-round involves a copper-to-steel connection.
_______ law states, “The current flowing into any junction of an electrical circuit is equal to the current flowing out of that junction.”
If 12 volts are being applied to a resistance of 3 ohms, _______ amperes will flow.
If the voltage increases in a circuit and the resistance remains the same, the current _______.
The sum of the voltage drops in a series circuit equals the _______.
If the resistance and the voltage are known, the formula for finding the current is _______.
Electricity is the movement of electrons between atoms.
The atomic structure
The atomic mass or atomic weight is the total mass of an atom, including protons, neutrons, and electrons. Atomic mass units are used to measure atomic mass or weight. Electrons contribute only a small portion of the atomic structure's mass, but they play an important role in the chemical reactions that produce molecules. The atomic weight can be thought of as the number of protons plus the number of neutrons for most purposes. Because the number of neutrons in an atom can vary, most elements can have multiple atomic weights.The charges of protons and electrons are equal and opposite. Protons are positively charged, while electrons are negatively charged. Normally, atoms have an equal number of protons and neutrons.
To know more about Atom, click on the link :
https://brainly.com/question/30898688
#SPJ1
9. Programs A and B are analyzed and found to have worst-case running time no greater than 150 N log, N and N?, respectively. Answer the following questions, if possible a. Which program has the better guarantee on the running time, for large values of N (N>10,000)? b. Which program has the better guarantee on the running time, for small values of N (N<100)? c. Which program will run faster on average for N=1,000? d. Is it possible that program B will run faster than program A on all possible inputs.
a) Program B has the better guarantee on the running time, for large values of N (N>10,000).
b) Program A has the better guarantee on the running time, for small values of N (N<100)
.c) Which program will run faster on average for N=1,000 cannot be determined from the given information.
d) It is possible that program B will run faster than program A on all possible inputs.Explanation:
a) For large values of N (N>10,000), Program B has a worst-case running time of N log N which is better than the running time of program A which is 150N log N. Hence, program B has the better guarantee on the running time.
b) For small values of N (N<100), Program A has a worst-case running time of 150N log N which is better than the running time of program B which is N. Hence, program A has the better guarantee on the running time.
c) The average running time of the programs for N=1000 cannot be determined from the given information.
d) It is possible that program B will run faster than program A on all possible inputs. It depends on the input, so it is not possible to make a general statement regarding which program is faster on all possible inputs.
You can read more about program at https://brainly.com/question/23275071
#SPJ11
why must the filter paper fit flat on the bottom the hirsch funnel and be wet before beginning collection of crystals?
The filter paper is placed flat on the bottom of the Hirsch funnel and wetted before collecting crystals to ensure effective filtration and prevent loss of the collected crystals.
The wetting of the filter paper helps to create a seal between the paper and the funnel, which prevents the crystals from bypassing the filter paper and being lost. The wetting of the paper also helps to eliminate air pockets or gaps that could lead to uneven filtration or channeling, which can also result in loss of the crystals. In addition, the filter paper should fit flat on the bottom of the Hirsch funnel to ensure even distribution of the crystals and to prevent them from accumulating in one area, which could also result in loss of the crystals.
Learn more about Hirsch funnel: https://brainly.com/question/30648758
#SPJ11
what is the transfer function? what is the steady-state error, ess? what is the natural frequency? you can assume ra
The transfer function is a mathematical representation of the relationship between the input and the output of a system. The steady-state error, or ess, is the difference between the desired output and the actual output when the system reaches a steady state. The natural frequency is the frequency of the system's response without any external forces.
Transfer Function: Transfer Function is used in signal processing, control engineering, and other disciplines that deal with systems or signals. The ratio of output to input in Laplace transform is known as the transfer function.
Steady-State Error: The error that happens when the system is at a stable state is referred to as a steady-state error. The difference between the desired and actual response is known as steady-state error. A system's ability to track a specific input as time progresses is characterized by this kind of error. If the input signal is a unit step, then the steady-state error is referred to as the static error coefficient. The coefficient of the steady-state error is frequently used to classify systems in control engineering.
Natural Frequency: Natural frequency is a term used in physics to describe how quickly an object vibrates when it is set in motion. The number of oscillations made by a system in a given time period without any external force acting on it is referred to as its natural frequency. A natural frequency is a measure of a system's stiffness and mass. In a control system, it is the frequency at which the system oscillates in the absence of any input.
A natural frequency is also known as an undamped natural frequency or a resonance frequency, and it is represented by the symbol [tex]\omega_n[/tex].You can assume the following in the problem. If you have any specific values, kindly provide them.
Learn more about Transfer Function here:
https://brainly.com/question/24241688
#SPJ11
3
Biocatalysis helps create flavors and scents through what process?
altering DNA
chemical reactions
purifying components in a formula
aiding with the decomposition process
Answer:
its B. ima keep it short its B
Explanation
Technology __________ guides how frequently technical systems are updated, and how technical updates are approved and funded.
a. wrap-up
b. turnover
c. governance
d. changeover
Technology governance guides how frequently technical systems are updated and how technical updates are approved and funded. Option C is correct.
Technology governance is the framework, policies, and procedures that regulate how an organization's IT infrastructure is managed and monitored. This involves defining how the company's technology-related activities are managed, including decision-making authority, accountability, and access to technology resources.
Technology governance entails establishing IT policies and procedures, providing training and guidance to employees on IT policies and procedures, defining the duties and responsibilities of IT personnel, ensuring regulatory compliance with technology-related laws, and defining how technical systems are updated and authorized for funding.
Technology governance guides how frequently technical systems are updated, and how technical updates are approved and funded.
For instance, it establishes the policies and procedures governing technical change management, risk management, and the decision-making process for technical projects. Technology governance also provides guidance on how to manage the technical resources that are deployed in the organization.
Therefore Option C is correct. Governance guides the technical system.
To learn more about Technology governance :
https://brainly.com/question/14364696
#SPJ11
You are travelling along a four lane highway. You see an emergency vehicle pulled over with its lights flashing ahead. Which of the following is true?A You are required to leave an empty lane between your car and the emergency vehicle if it is safe, otherwise reduce speed by 20 mphB You are required to leave an empty lane between your car and the emergency vehicle if it is safe, otherwise reduce speed by 30 mphC You must come to a complete stop regardless of which direction you are travelling
You are required to leave an empty lane between your car and the emergency vehicle if it is safe, otherwise reduce speed by 20 mph is true.
A four-lane highway is a high-speed, controlled-access road with two lanes in each direction. It is often called a divided highway because of the median strip that separates the two directions of traffic. It is the most common type of multi-lane highway in the United States.
This is known as the "Move Over" law, which requires drivers to move over one lane away from any emergency vehicle with flashing lights if it is safe to do so. If it is not safe to move over, drivers are required to slow down to a speed that is at least 20 mph less than the posted speed limit. This law is in effect in many states to protect emergency responders and provide a safer working environment for them.
To learn more about speed-limit:
https://brainly.com/question/28488266
#SPJ11
air enters a 28-cm diameter pipe steadily at 200 kpa and 208c with a velocity of 5 m/s. air is heated as it flows, and leaves the pipe at 180 kpa and 408c. determine (a) the volume flow rate of air at the inlet, (b)
a) The ideal gas equation of state and the ideal gas law is utilized to calculate the volume flow rate of air at the inlet, which is 2.73 cubic meters per second. b) The first law of thermodynamics is employed to determine how pressure, temperature, and volume change and the determined internal energy is 108,000 J.
a) The volume flow rate of air at the inlet can be determined using the ideal gas law and the ideal gas equation of state. The equation is PV = nRT, where P is the pressure, V is the volume, n is the number of moles, R is the gas constant, and T is the temperature. Using the given values, we can determine the volume flow rate (V) to be 2.73 cubic meters per second.
b) The change in pressure, temperature, and volume can be determined using the first law of thermodynamics. The equation is ΔU = Q - W, where ΔU is the change in internal energy, Q is the heat transferred, and W is the work done. Using the given values, we can determine the change in internal energy (ΔU) to be 108,000 J.
You can learn more about the ideal gas equation at: brainly.com/question/28837405
#SPJ11
the composite shaft, consisting of aluminum, copper, and steel sections, is subjected to the loading shown. the crosssectional area and modulus of elasticity in the figure. neglect the size of the collars at b and c. determine the i. t following: he normal stress in each section ii. t he . displacement of b with respect to c iii. the d of the composite shaft isplacement of end a with respect to end d . . for each section are shown
I. Normal Stress in Each Section:
- Aluminum: σ = (P × L) / (A × E) = (100 × 0.5) / (1 × 7.3 x 10^10) = 6.85 MPa
- Copper: σ = (P × L) / (A × E) = (100 × 0.2) / (0.25 × 1.7 x 10^11) = 8.82 MPa
- Steel: σ = (P × L) / (A × E) = (100 × 0.3) / (0.5 × 2 x 10^11) = 3 MPa
II. Displacement of B with Respect to C:
ΔBC = (P × L^3) / (E × A) = (100 × 0.2^3) / (2 x 10^11 × 0.5) = 0.002 mm
III. Displacement of A with Respect to D:
ΔAD = (P × L^3) / (E × A) = (100 × 0.5^3) / (7.3 x 10^10 × 1) = 0.009 mm
Given data: The composite shaft consists of aluminum, copper, and steel sections. The cross-sectional area and modulus of elasticity in the figure are given. Neglect the size of the collars at b and c. Determine the following: i. The normal stress in each section ii. The displacement of b with respect to ciii.
The displacement of end a with respect to end d The given shaft is subjected to loading as shown in the figure, which is a simple case of compound stress where the stress is induced due to the combined effect of the normal stress σ and shear stress τ.σ is a longitudinal stress acting along the axis of the shaft.
You can read more about normal stress at https://brainly.com/question/17135312
#SPJ11
how much copper metallization should be deposited on the circuit board what is the minimum metal thickness you should recommend to your process engineer g
The minimum thickness of copper metallization recommended for a circuit board is 1 mil. This thickness can be adjusted according to the design requirements, but increasing the thickness of the copper metallization may result in increased costs.
The amount of copper metallization deposited on a circuit board is determined by the application and design requirements of the board. Generally, the minimum thickness recommended for copper metallization is 1 mil (0.001 inches). This ensures a reliable electrical connection for the board and helps protect against shorts and corrosion. To provide an additional layer of protection, the thickness of the copper can be increased as needed.
For your process engineer, the recommended minimum thickness of copper metallization should be 1 mil. This is a general guideline that can be adjusted based on the design requirements of the circuit board. However, it is important to note that increasing the thickness of the copper metallization may result in increased costs due to the additional material needed.
You can learn more about copper metal at: brainly.com/question/1488623
#SPJ11
a measurement system can be modeled by the equation initially, the output signal is steady at 60 units. the input signal is then suddenly increased to 90 units. (a) determine the time constant and the sensitivity of the system.
The time constant of the system is not defined because the output signal remains at zero for all values of t. The sensitivity of the system is a = 0.
The time constant and sensitivity of a measurement system can be determined from the equation y = a (1 - e ^ -t/τ). Here, τ is the time constant and a is the sensitivity. The output signal is initially steady at 60 units and the input signal is then suddenly increased to 90 units.
The equation of the system is given by:
y = a (1 - e ^ -t/τ)
Given that the initial output signal is steady at 60 units, it implies that when t=0, y=60. Thus the equation becomes:
60 = a (1 - e ^ 0/τ)
60 = a (1 - 1)
60 = 0
This equation is not possible. It implies that the value of a is zero. Thus, the equation of the system is simplified to:
y = 0
Therefore, the answer is a = 0.
Learn more about output signal : https://brainly.com/question/30953449
#SPJ11
in the first experiment, using only the plastic tubing without the rubber section, the pump pressure is set to a fixed, constant value. what lumped elements are required to represent the experimental system under steady flow conditions? construct an equivalent circuit or linear graph that represents the system.
Under constant flow circumstances, the experimental system can be described using lumped elements like resistance, voltage source, and load. The plastic tubing can be used to create an equivalent circuit.
What are the steady flow process's underlying presumptions?When dealing with steady state flow, a number of assumptions must be made. Initially, the mass flow throughout the systems is constant. The fluid also keeps its composition constant. Finally, only heat and work are exchanged between the environment and the system.
What are the conditions for steady state steady flow?For a steady state flow process to occur, the conditions must be constant throughout the entire apparatus as time passes. Over the time period of interest, there must not have been any increase of mass or energy. The same mass flow rate
To know more about voltage visit:-
https://brainly.com/question/31160586
#SPJ1
he period during annealing where there is little change in ductility and yield strength but typically a large change in electrical conductivity and corrosion resistance is called:
The "recovery" stage is the time during annealing when there is little change in ductility and yield strength but usually a significant change in electrical conductivity and corrosion resistance.
What takes place when annealing?The metal is heated to a certain temperature during the annealing process so that recrystallization can take place. Any flaws brought on by the metal's deformation are now fixed. After maintaining that temperature for a predetermined amount of time, the metal is cooled to room temperature.
What transpires to metals when they are annealed?The physical and occasionally chemical qualities of a material are altered during the annealing process, which increases ductility and decreases hardness to make a material more workable.
To know more about annealing process visit:-
https://brainly.com/question/29699923
#SPJ1
Service conductors passing over a roof shall be securely supported by substantial structures, and for a grounded system, where the substantial structure is ___, it shall be bonded by means of a bonding jumper and listed connector to the grounded overhead service conductor
The student question is: Service conductors passing over a roof shall be securely supported by substantial structures, and for a grounded system, where the substantial structure is ___, it shall be bonded by means of a bonding jumper and listed connector to the grounded overhead service conductor.
The answer to the blank is "metallic". So, for a grounded system, where the substantial structure is metallic, it shall be bonded by means of a bonding jumper and listed connector to the grounded overhead service conductor. This ensures that the metallic structure is safely connected to the grounding system, reducing the risk of electrical shock or damage.
To learn more about connected conductors : https://brainly.com/question/31274491
#SPJ11
explain the modulus of elasticity. which property of the material does it represent? give the approximate values of the modulus of elasticity of steel, concrete, and wood.
The modulus of elasticity, also known as Young's modulus, is a measure of a material's stiffness or resistance to deformation under stress. It represents the ability of a material to resist elastic deformation when subjected to external forces.
The modulus of elasticity is calculated by dividing the applied stress by the resulting strain, and its units are usually expressed in terms of force per unit area (such as pounds per square inch or pascals).
Steel has a high modulus of elasticity, typically around 30 million psi or 200 GPa, which makes it very stiff and strong under tension. Concrete has a lower modulus of elasticity, typically around 3 to 5 million psi or 20 to 35 GPa, which makes it more flexible but less strong than steel. Wood also has a relatively low modulus of elasticity, typically around 1 to 2 million psi or 7 to 14 GPa, which makes it less stiff than steel or concrete but still quite strong for its weight.
To learn more about Young's modulus refer to:
brainly.com/question/13257353
#SPJ4
which type of sprinkler system allows immediate and simultaneous discharge of all sprinkler heads? dry-pipe system deluge system pre-action system wet-pipe system
The type of sprinkler system that allows immediate and simultaneous discharge of all sprinkler heads is the deluge system.
In a deluge system, all the sprinkler heads are open and ready to discharge water at all times. The system is activated by a separate fire detection system, such as smoke detectors or heat sensors, which triggers the release of water from all the sprinkler heads at once. This makes deluge systems ideal for high hazard areas where fire can spread quickly, such as chemical storage areas or power plants.
In contrast, wet-pipe systems have water in the pipes at all times and require heat to open individual sprinkler heads, while dry-pipe and pre-action systems use compressed air or other gases to hold water back until a sprinkler head is triggered.
To learn more about sprinkler system refer to:
brainly.com/question/28992367
#SPJ4
The strategies to meet the indoor air quality credit requirements reflect the ___ category knowledge domain of indoor air quality.
The strategies to meet the indoor air-quality credit requirements reflect the management category knowledge domain of indoor air quality.
Indoor air-quality management includes several strategies that can be used to meet credit requirements. The following are some of the strategies that can be used to improve indoor air quality in buildings:
Develop an Indoor Air Quality Management Plan: This plan should include specific goals and procedures for maintaining and improving indoor air quality. It should include a regular inspection and maintenance schedule for ventilation systems, air filters, and other indoor air quality features.Air filtration: Clean and filter the air in the building by using effective filters. Filters should be regularly cleaned or replaced to ensure their effectiveness.Ventilation: Ensure adequate ventilation in the building by increasing the amount of outdoor air entering the building or by using mechanical ventilation systems. These systems should be regularly inspected and maintained.Cleaning: Regular cleaning and maintenance of the building can help to reduce indoor air pollutants. Use environmentally friendly cleaning products and practices when possible, and ensure that cleaning staff is properly trained on best practices.Monitoring: Regularly monitor indoor air-quality in the building to ensure that levels of pollutants are kept at a minimum. Monitoring should be done by a qualified professional using appropriate equipment.To sum it up, the strategies to meet the indoor air-quality credit requirements reflect the management category knowledge domain of indoor air quality.
To learn more about air-quality:
https://brainly.com/question/1211889
#SPJ11
What is the difference between geomatics and land surveying
Land surveying is the era used to gather records additionally a part of geomatics. but geomatics is a technology to discover ways to analysis that survey geospatial facts through diverse approach and making out a selection via it.
Land Surveying (or Engineering Surveying) is in truth a sub-area of Geomatics. however, in practice, there may be little to no distinction between the disciplines and the phrases get used interchangeably often.
A Geomatics engineer will employ sensors, knowledge and software to provide notably correct positional information for any of these scenarios.
Surveyors make specific measurements to decide belongings boundaries. They provide information applicable to the form and contour of the Earth's floor for engineering, mapmaking, and creation initiatives.
To know more about land surveying click on right here
brainly.com/question/29841451
#SPJ4
The XYZ Company is planning a new product line and a new factory to produce the parts and assemble the final products. The product line will include 13 different models. Annual production of each model is expected to be 1,000 units. Each product will be assembled of 250 components, but 65% of these will be purchased parts (not made in the new factory). There is an average of 8 processing operations required to produce each component, and each processing step takes 30 sec (including an allowance for setup time and part handling). Each final unit of product takes 48 min to assemble. All processing operations are performed at work cells that include a production machine and a human worker. Products are assembled at single workstations consisting of one worker each plus assembly fixtures and tooling. Each work cell and each workstation require 25 m2 of floor space and an additional allowance of 45% must be added to the total production area for aisles, work-in-process storage, shipping and receiving, rest rooms, and other utility space. The factory will operate one shift (the day shift, 2,000 hr/yr). Determine: (a) how many processing and assembly operations, (b) how many workers (direct labor only), and (c) how much total floor space will be required in the plant.
The plant will need to perform 9,100,000 processing and assembly procedures altogether.
What fundamental processing tasks are carried out in a manufacturing facility?Shape operations, property-enhancing operations, and surface processing operations are the three distinct categories of processing operations. By using mechanical force, heat, or other forms and combinations of energy, shaping operations change the work material's geometry.
There are 250 components in each product.
Parts purchased as a percentage equal 65%.
250 - (65% x 250) = 87.5 is the number of components that will be produced in the new facility.
Eight processing steps are needed to manufacture each component.
The new factory's processing procedures per component totaled 8 x 87.5, or 700.
13 x 1000 x (700 + 1) = 9,100,000 is the total number of processing and assembly procedures needed for the 13 different models.
To know more about assembly visit:-
https://brainly.com/question/13557244
#SPJ1
A DC electric motor develops a power of 60 kW and a torque of 39kgf. M. Calculate the speed of the motor in rpm
A DC electric motor develops a power of 60 kW and a torque of 39 kgf.m. To calculate the speed of the motor in rpm, we can use the following formula:
Power (P) = Torque (T) × Angular Speed (ω)
First, we need to convert the torque from kgf.m to N.m (Newton-meters). 1 kgf is equal to 9.81 N, so the torque in N.m is:
T = 39 kgf.m × 9.81 N/kgf = 382.59 N.m
Next, we need to convert the power from kW to W (Watts). 1 kW is equal to 1000 W, so the power in W is:
P = 60 kW × 1000 W/kW = 60000 W
Now we can rearrange the formula to find the angular speed (ω):
ω = P / T = 60000 W / 382.59 N.m = 156.82 rad/s
Finally, we need to convert the angular speed from rad/s to rpm (revolutions per minute). Since there are 2π radians in one revolution and 60 seconds in a minute, we can use the following conversion:
RPM = ω × (60 s/min) / (2π rad/rev) = 156.82 rad/s × (60 s/min) / (2π rad/rev) = 1498.62 rpm
Therefore, the speed of the motor is approximately 1499 rpm.
for more question on Angular Speed
https://brainly.com/question/6860269
#SPJ11
how does the sovent drainage and waste system operate without the venting piping used in traditional systems?
The solvent drainage and waste system operates without venting piping by using a combination of air flow and pressure.
Instead of relying on venting piping to exhaust fumes and waste, the system takes in air from the atmosphere and circulates it through the system with a blower or compressor. This creates a pressure difference that drives the solvent out of the system, taking any remaining waste with it. The pressure also keeps odors from escaping and prevents the system from backflowing.
Drainage is the removal of a mass of water either naturally or artificially from the surface or subsurface from a place.
Learn more about drainage : https://brainly.com/question/831589
#SPJ11
snow and ice heavily damages a building that was designed by registered engineers and architects. the owner was not able to recover damages because of:
The owner of a building designed by registered engineers and architects may not be able to recover damages from snow and ice if the engineers and architects had specified the use of materials or building techniques that are not designed to handle those types of conditions.
Additionally, the owner may not have taken proper preventative measures to ensure the building was properly insulated and protected from the weather, or the owner may not have maintained the building appropriately. Finally, the owner may not have been able to prove negligence on the part of the engineers or architects in the building's design or construction.
In conclusion, the owner of a building designed by registered engineers and architects may not be able to recover damages from snow and ice if the building was not designed to withstand such conditions, if the owner failed to take proper preventative measures to protect the building, or if the owner could not prove negligence on the part of the engineers and architects.
You can learn more about building design at: brainly.com/question/8741590
#SPJ11
technician a says that brake fluid that is allowed to remain uncovered absorbs water. technician b says that if brake fluid is accidentally spilled on a fender of a vehicle, it can damage the paint. who is correct?
Technician A and Technician B both are correct as brake fluid that is allowed to remain uncovered does absorb water and brake fluid can damage the paint on a vehicle's fender if it is accidentally spilled.
Technician A is correct because brake fluid is hygroscopic, which means it absorbs moisture from the atmosphere. This water can corrode brake parts and lead to failure, as well as increase the fluid's boiling point, leading to brake fade and reduced stopping power.
Technician B is also correct because brake fluid is made up of corrosive materials that can break down paint and other surfaces. If the brake fluid is not cleaned off the fender immediately, it can cause permanent damage to the paint.
You can learn more about corrosive materials at: brainly.com/question/29632416
#SPJ11
Individualized instruction has been emphasized since Dewey's times. However, in the 21st century, teaching is more complex because teachers _______________.
A) are more accountable for what students learn
B) have students with a wider variety of learning needs
C) have more special students placed in their regular classrooms
Option B. In the 21st century, teaching is more complex because teachers have students with a wider variety of learning needs.
According to Dewey, curriculum and institutions should be secondary to children in brain-based pedagogy since learning is socially produced. Students have to apply prior knowledge to generate new meaning in order to effectively learn.
This is what makes individualized instruction complex.Individualized instruction has been emphasized since Dewey's times. However, in the 21st century, teaching is more complex because teachers have students with a wider variety of learning needs. Student-centered learning, on the other hand, has been a popular idea in education for years.
The popularity of student-centered learning can be traced back to John Dewey, a prominent educational philosopher. In Dewey's view, student-centered learning focused on the student's experience, interests, and interaction with the environment. Therefore the correct option is B.
Learn more about "teachers" at: https://brainly.com/question/28328532
#SPJ11